Distribution board, socket outlets, down lights, light switches, fans & fan isolation switches & smoke detection installed throughout to the highest standard making little damage to walls prior to plastering. This was a very smoothly run job which all went well liaising with other trades throughout & working well as a team!
Electric Equipment Installed On This Project: